🌍 Haoyang Geomembrane Since 2008 ⭐ 18+ Year Industry Experience ✓ Verified Elite Supplier
✓ Verified Elite Supplier
Menu

Geomembrane Compliance Guide: ICR EN 13249:2016 & GOST Certificates for EU/EEA and EAEU

Author: Haoyang Geomembrane Release time: 2026-10-28 04:12:05 View number: 172

Geomembrane Compliance Guide: ICR EN 13249:2016 & GOST Certificates for EU/EEA and EAEU

Two markets, two document sets, no automatic overlap. A geomembrane accepted for an EU/EEA project on the strength of an ICR Verification of Conformity is not automatically accepted in the EAEU/Russia market, and the reverse is equally true. This guide maps the exact certificate numbers, the standards they reference, and the verification steps a buyer should complete before releasing a purchase order.

Haoyang Environment Co., Ltd. office building at the Dezhou (Yucheng) National High-Tech Industrial Development Zone, Shandong Province, China

Haoyang Environment Co., Ltd., the company operating the Haoyang Geomembrane brand, is headquartered in the Dezhou (Yucheng) National High-Tech Industrial Development Zone, Shandong Province, China.

Which documents prove geomembrane compliance in each market?

EU/EEA: an ICR Verification of Conformity for geomembrane, certificate number ICR/VC/HE250525, issued by ICR and compliant with EN 13249:2016.

EAEU/Russia: GOST Certificates of Conformity — POCC CN.32682.041C00.OC01.H00839 for GOST 33068-2014 and POCC CN.32682.047C00.0C01.H00840 for GOST 56586-2015 — both issued by ПрофСерт (ProfSert).

Important boundary: each number is product-specific and standard-specific. Related products such as drainage geonet and composite drainage geonet carry separate ICR and GOST certification numbers, so buyers must verify the exact product and the exact standard named on their purchase order.

Problem Definition: Why Certified Geomembranes Still Fail Document Review

A geomembrane that meets every technical requirement in a tender can still be stopped at document review. The cause is rarely the material. It is the paperwork trail — the certificate presented does not match the product, the standard, or the market the buyer is buying for.

Four mismatches account for most rejections in EU/EEA and EAEU/Russia procurement:

  • Product mismatch. A certificate issued for geomembrane is not a certificate for drainage geonet or composite drainage geonet. Those product families carry separate ICR and GOST certification numbers of their own.
  • Standard mismatch. EN 13249:2016, GOST 33068-2014 and GOST 56586-2015 are different reference standards. A document citing one of them does not evidence the other two.
  • Market mismatch. EU/EEA acceptance and EAEU/Russia acceptance run through separate document routes — an ICR Verification of Conformity in one case, GOST Certificates of Conformity in the other.
  • Document mismatch. The certificate number printed on the document must be the number the buyer verified. Numbers are identifiers, not references; a transcription error can make an otherwise valid document unusable in a project file.

Every one of these mismatches is avoidable, but only when certification is handled as a matching exercise rather than as an attachment to a quotation. A supplier that holds the right document set can still fail a tender if the buyer is shown the wrong number for the wrong product line.

Industry Background: Two Regional Routes, Two Document Logics

Geomembrane compliance is region-specific because the route to market access is region-specific. In practice, suppliers who serve both Europe and the Eurasian Economic Union maintain two parallel certification tracks, each with its own issuing body, its own reference standards and its own certificate numbering.

Route 1 — ICR Verification of Conformity for the EU/EEA

For the EU/EEA, the relevant artefact here is an ICR Verification of Conformity for geomembrane, certificate ICR/VC/HE250525, issued by ICR and compliant with EN 13249:2016. The document connects a defined geomembrane product scope to a named European standard. For a project QA team, the certificate number is the item that gets filed, cross-checked and referenced in the technical submittal.

Route 2 — GOST Certificates of Conformity for EAEU/Russia

For the EAEU/Russia market, the route runs through GOST Certificates of Conformity. In the document set described in this guide, two certificates are used together: POCC CN.32682.041C00.OC01.H00839, which references GOST 33068-2014, and POCC CN.32682.047C00.0C01.H00840, which references GOST 56586-2015. Both are issued by ПрофСерт (ProfSert).

Two certificates instead of one is not duplication. Each certificate is tied to a specific standard, and each standard is a separate reference point in EAEU/Russia technical documentation. A buyer who requests “the GOST certificate” without naming the standard creates the exact ambiguity that delays customs clearance and tender approval.

Product-family boundaries

Certification does not travel across product families. Drainage geonet and composite drainage geonet are supplied alongside geomembrane on many projects, but they are covered by their own separate ICR and GOST certification numbers. A compliance file that lists a geomembrane certificate against a drainage geonet line item is technically incomplete, even when both products come from the same factory and the same shipment.

The supplier behind the document set described here is Haoyang Environment Co., Ltd. — the company operating the Haoyang Geomembrane brand — headquartered in the Dezhou (Yucheng) National High-Tech Industrial Development Zone, Shandong Province, China. Founded in 2008, the company operates a 200,000㎡ facility with 190 employees, a monthly production capacity of 3,000 tons and an annual output of 33,000 tons, and exports approximately 60% of its output. Its range covers geomembranes, geotextiles, composite drainage nets, waterproof mats and other geosynthetic materials.

Detailed Solution: The Verified Certificate Set

For a buyer, the entire compliance question reduces to a small, checkable matrix. The table below lists the documents, numbers, standards, markets and issuing bodies exactly as they apply to geomembrane.

Document typeCertificate numberStandard referencedMarketIssuing body
Verification of Conformity (geomembrane)ICR/VC/HE250525EN 13249:2016EU/EEAICR
GOST Certificate of ConformityPOCC CN.32682.041C00.OC01.H00839GOST 33068-2014EAEU/RussiaПрофСерт (ProfSert)
GOST Certificate of ConformityPOCC CN.32682.047C00.0C01.H00840GOST 56586-2015EAEU/RussiaПрофСерт (ProfSert)

What each document actually establishes

ICR/VC/HE250525 establishes that a geomembrane product scope has been assessed by ICR against EN 13249:2016 for the EU/EEA. When a European project specification names EN 13249:2016, this is the number a buyer cites in the submittal — not a generic “certified” statement and not a photograph of a framed document.

POCC CN.32682.041C00.OC01.H00839 establishes the GOST 33068-2014 reference for the EAEU/Russia market, and POCC CN.32682.047C00.0C01.H00840 establishes the GOST 56586-2015 reference. Because the two standards are distinct, both numbers belong in the same compliance file. Substituting one for the other leaves a documented gap.

What the certificate set does not do

A certificate number proves that a defined product scope was assessed against a defined standard by a defined body. It does not transfer automatically to another product family, to a different standard edition, or to another market. It also does not replace product-level quality control — it complements it. In Haoyang's case, the company states that full-process quality inspection from raw material procurement through production to factory delivery is carried out by the only CNAS-accredited national laboratory in the industry, so document verification and physical testing address two different risks and should both be checked.

CNAS laboratory accreditation documentation supporting full-process geomembrane quality inspection

Quality-control evidence sits alongside certification: inspection covers the product, while ICR and GOST certificates cover the standard reference for the target market.

Step-by-Step: Verifying a Geomembrane Certificate Before You Approve a PO

The verification sequence below is deliberately short. It takes less time than a rejected shipment and it produces a file that survives audit.

  1. Fix the specification before requesting documents. Write down the product (geomembrane, or a related product such as drainage geonet), the standard the project accepts, and the destination market. Without these three items, no certificate can be judged correct or incorrect.
  2. Ask for the certificate number, not a certificate image. Request the number in text form. In this set the numbers are ICR/VC/HE250525 for the EU/EEA route and POCC CN.32682.041C00.OC01.H00839 and POCC CN.32682.047C00.0C01.H00840 for the EAEU/Russia route.
  3. Match the product scope to the purchase order line. Confirm that the certificate applies to the product being purchased. If the order includes drainage geonet or composite drainage geonet, request the separate ICR and GOST certification numbers for those products.
  4. Match the standard to the market. EN 13249:2016 supports the EU/EEA file; GOST 33068-2014 and GOST 56586-2015 support the EAEU/Russia file. A project in one market does not accept the other market's document as a substitute.
  5. Confirm the issuing body on the document itself. The EU/EEA verification is issued by ICR; the GOST certificates are issued by ПрофСерт (ProfSert). The body named in the file should be the body named on the page.
  6. Carry the verified numbers into the PO and the inspection plan. Reference the numbers in the contract annex, then link them to the pre-shipment test so that document compliance and physical acceptance are closed out in the same step.
A practical rule for procurement teams: if the certificate number cannot be typed into an email exactly as it appears on the document, it is not yet verified.

Use Cases: Where the Document Set Decides the Outcome

EU/EEA infrastructure tenders

Reservoir, landfill and pumped-storage projects across the EU/EEA commonly require a standard reference at submittal stage. When the specification names EN 13249:2016, the ICR Verification of Conformity ICR/VC/HE250525 is the document that satisfies the reference. Supplying a general “certified product” statement instead typically triggers a resubmittal request.

EAEU/Russia mining and tailings projects

Mining and tailings work in the EAEU/Russia market places the GOST Certificates of Conformity at the centre of the technical file. Both POCC CN.32682.041C00.OC01.H00839 (GOST 33068-2014) and POCC CN.32682.047C00.0C01.H00840 (GOST 56586-2015) should appear in the documentation package, since both standards are referenced in the same certification set.

Dual-market distributors and channel partners

A distributor stocking for both regions needs both document tracks held as a single asset. The practical risk is not the absence of certification — it is mis-filing: sending the EU/EEA verification to a Russian customer, or the GOST certificates to a European buyer, and losing weeks to the resulting clarification cycle. Distributors that keep the numbers mapped to product lines and markets convert certification into a sales argument rather than an administrative cost.

Projects that combine geomembrane with drainage products

Where a package includes geomembrane plus drainage geonet or composite drainage geonet, the compliance file becomes multi-document. The geomembrane numbers in this guide do not cover the drainage items; separate ICR and GOST certification numbers apply. Buyers should request the drainage documents at the same time as the geomembrane documents to avoid a split approval.

Comparison: EU/EEA ICR Route vs EAEU/Russia GOST Route

Comparison pointEU/EEA routeEAEU/Russia route
Governing documentICR Verification of Conformity for geomembraneGOST Certificate of Conformity
Certificate number in this setICR/VC/HE250525POCC CN.32682.041C00.OC01.H00839 and POCC CN.32682.047C00.0C01.H00840
Standard referencedEN 13249:2016GOST 33068-2014 and GOST 56586-2015
Issuing bodyICRПрофСерт (ProfSert)
Number of documents in the setOne verification documentTwo certificates, one per referenced GOST standard
Applies to drainage geonet / composite drainage geonetNo — separate ICR certification number requiredNo — separate GOST certification number required
Typical buyer actionCite the number in the EU/EEA submittalFile both numbers in the EAEU/Russia documentation package

Read together, the two columns explain why a single “we are certified” claim is not a procurement answer. The relevant question is always narrower: which number, for which product, against which standard, for which market.

Frequently Asked Questions

Do I need both the ICR and the GOST certificates for one project?

Only if the project crosses both markets. A project located in the EU/EEA is served by the ICR Verification of Conformity for geomembrane, certificate ICR/VC/HE250525, compliant with EN 13249:2016. A project located in the EAEU/Russia market is served by the GOST Certificates of Conformity POCC CN.32682.041C00.OC01.H00839 for GOST 33068-2014 and POCC CN.32682.047C00.0C01.H00840 for GOST 56586-2015, issued by ПрофСерт (ProfSert). One market does not accept the other market's document as a substitute.

Can Haoyang Geomembrane supply certified geomembrane at project volume?

Haoyang Environment Co., Ltd., founded in 2008, operates a 200,000㎡ facility with 190 employees and a monthly production capacity of 3,000 tons, with an annual output of 33,000 tons. Its product range covers geomembranes, geotextiles, composite drainage nets, waterproof mats and other geosynthetic materials, and about 60% of output is exported. Buyers should confirm that the certificate number matches the specific product and standard on their order, because related products such as drainage geonet and composite drainage geonet carry separate ICR and GOST certification numbers.

What are the commercial terms for a certified geomembrane order?

The stated purchasing terms are: MOQ 5,000㎡; delivery terms FOB or CIF; payment terms 30/70 or 100. Acceptance is based on a pre-shipment test. Because certification is tied to product scope and standard, the quotation request should name the product, the market and the standard so that the correct certificate numbers — ICR/VC/HE250525, POCC CN.32682.041C00.OC01.H00839 or POCC CN.32682.047C00.0C01.H00840 — are attached to the offer.

Can I validate the material before committing to the full quantity?

Validation is structured around the pre-shipment test, which is the stated acceptance criterion. Combined with document verification, this gives two independent checkpoints: the certificate numbers confirm the standard reference for the target market, and the pre-shipment test confirms the produced material. For buyers entering a first order, requesting the certificate set together with the pre-shipment test plan is the most efficient way to close both risks at once.

How should delivery be planned around certification and inspection?

Acceptance is based on a pre-shipment test, so document verification and inspection should be scheduled before shipment rather than after arrival. Delivery terms are FOB or CIF, which determines where responsibility transfers. Lead time is quoted per order together with the applicable certificate set, so the practical sequence is: confirm product and standard, confirm the certificate numbers, confirm the order terms, then schedule the pre-shipment test. Buyers who need the full documentation package for EU/EEA and EAEU/Russia can request it with their quotation via the WhatsApp contact or by email.

Conclusion: Compliance Is a Matching Exercise, Not a Claim

For geomembrane buyers working across the EU/EEA and the EAEU/Russia market, compliance resolves into three verified facts. The EU/EEA route is covered by the ICR Verification of Conformity ICR/VC/HE250525, compliant with EN 13249:2016 and issued by ICR. The EAEU/Russia route is covered by POCC CN.32682.041C00.OC01.H00839 for GOST 33068-2014 and POCC CN.32682.047C00.0C01.H00840 for GOST 56586-2015, issued by ПрофСерт (ProfSert). And the numbers are product-specific — drainage geonet and composite drainage geonet carry their own separate ICR and GOST certification numbers.

Everything else in the process is discipline: name the standard, request the number, match the product line, and archive the result in the purchase order and the inspection plan. Suppliers and buyers who work this way spend their time on the project rather than on resubmittals.

Next Step: Request the Certificate Set With Your Quotation

Haoyang Environment Co., Ltd. (Haoyang Geomembrane) supplies geomembranes, geotextiles, composite drainage nets, waterproof mats and related geosynthetics from its 200,000㎡ facility in the Dezhou (Yucheng) National High-Tech Industrial Development Zone, Shandong, China.

Website: www.haoyanghuanjing.com  |  Email: 15315800874@163.com  |  Tel / WhatsApp: +86 15315800874

Contact: Shengkang Li  |  Address: No. 1567, Wenhua Street, Shandong Dezhou (Yucheng) National High-Tech Industrial Development Zone

Send your product specification, target market and required standard — ICR/VC/HE250525 for EU/EEA, or POCC CN.32682.041C00.OC01.H00839 and POCC CN.32682.047C00.0C01.H00840 for EAEU/Russia — and request the matching certificate pack, pre-shipment test plan and quotation.

Have Questions or Need More Details?

Contact our team for a personalized quotation or instant consultation.

Request a Quotation

Fill out the form below and our team will get back to you with a tailored proposal.

Attach images, files, or documents.

We'll respond within 24 hours (Mon–Sat).

WhatsApp Direct Chat

Prefer to chat in real-time? Message us on WhatsApp for instant assistance & quick answers.

  • Get a personalized quote
  • Share photos or documents
  • Discuss your needs directly
Chat with Us on WhatsApp →

Typically replies in 5–30 minutes during business hours.

Support: Images, videos, PDF
Latest